IBM i (AS/400) Support & Modernization

IBM i (AS/400) support for RPG and Db2 applications

IBM i 7.4 moved from standard support to IBM’s paid Service Extension on 30 September 2026. The application on it may know your pricing, stock and production rules better than any document. AIONDATA supports RPG and CL applications, connects them to newer systems and plans the move to 7.5 or 7.6 around those rules.

Vendor support dates

IBM i release dates: 7.3, 7.4 and the current releases.

IBM marks the end of standard support for a release with a “change in service level” date. After it, defect support is available through a paid Service Extension for a limited time. IBM i 7.5 and 7.6 have no end date yet, and IBM says it will announce one at least 12 months in advance.

IBM i / AS/400 support dates
VersionMilestoneDateSource
IBM i 7.3Standard support endedIBM i release life cycle
IBM i 7.4End of marketingIBM i release life cycle
IBM i 7.4Standard support ended; Service Extension beganIBM i release life cycle
IBM i 7.3Extended Service Extension endsIBM i release life cycle
IBM i 7.4Service Extension endsIBM i release life cycle

Checked against the vendor pages on . Your agreement, edition and installed release decide what applies to you. All end-of-support dates

Moving from IBM i 7.4 to 7.5 or 7.6.

Programs on IBM i are designed to keep running across operating system releases, so an upgrade is usually less disruptive than on other platforms. The risk sits around the programs: whether your Power hardware and firmware support the target release, third-party software and licence keys, and the jobs, user profiles and network services configured years ago.

We map what runs on the system, confirm the target release with your hardware and software vendors, rehearse the upgrade on a test partition or copy, and check the batch schedule and interfaces before the production change.

  • Confirm the target release supports your Power hardware and firmware.
  • Check third-party software and licence keys for the target release.
  • List batch jobs, schedules, interfaces and the operators who watch them.
  • Rehearse on a test partition or copy, then compare the outputs.
  • Agree the production window and the fallback plan.

Opening RPG logic and Db2 for i data to other systems.

Most IBM i applications do not need replacing to connect to a web shop, a CRM or an AI assistant. An existing RPG or CL program can be called as a web service, so new systems use the same validated business logic as the green screens. Db2 for i data can be read through SQL for reporting and inquiries.

We start read-only, with one inquiry that staff currently re-key, and add updates only through narrow, tested operations that keep the application’s own validation in charge.

Keep the work moving

Start with the part
your business relies on.

IBM i application owners, operations leaders and teams inheriting RPG or CL workloads.

The problem is often not the platform itself. It is a program only one person understands, a batch process that cannot be interrupted or a modern application waiting for access to an established workflow.

01

Recover operating knowledge

Identify program source, libraries, jobs, schedules, data dependencies and the operators who handle exceptions. Establish the actual release and service arrangements.

02

Connect a bounded process

Assess an interface around the required business operation. Preserve application validation and identity rather than treating a database connection as the complete solution.

03

Modernize in stages

Separate a user journey or external handoff when the boundary is understood. Review regression evidence and recovery before replacing a critical program.

What useful progress looks like

Give customer service an answer without disturbing fulfillment.

Staff re-key an order reference into several screens to explain a delivery delay.

Illustrative engagement. Scope and acceptance criteria are agreed for your environment.

  1. Identify the authoritative order and dispatch records.
  2. Expose an approved, permissioned inquiry path.
  3. Compare responses with the existing operational screens.
The acceptance checkThe agreed inquiries return matching status and timestamps, and unauthorized users cannot access the protected records.

Choose the change that earns its place

Keep, improve
or move forward.

Where AI could help

An assistant could explain the retrieved order status with references. Start with read-only inquiries and keep program execution or business changes behind narrow, tested operations.

AI is an optional improvement, assessed against a specific task and measurable outcome.

When to retain and improve

Keep proven programs when ownership, tooling and operating support are sufficient and an interface can solve the immediate problem.

When to consider modernization

Consider staged change when a business capability cannot evolve, source ownership is inadequate or release/hardware dependencies require a transition.

A concrete first engagement

Know what you have.
Know what comes next.

An application and batch-dependency assessment focused on one business process, its source ownership and its connection to external systems.

A paid assessment with scope, access and fee agreed before work starts. You receive findings, an ownership map, prioritized options and a proposed next phase.

Discuss an assessment

Useful details to bring

  • IBM i release and application languages
  • Program source, job schedules and operators
  • The business inquiry or transaction to connect

Missing details are part of the assessment. Please start with what you know about the system and the business problem.

Tell us where the work gets stuck

Bring the problem.
We’ll work through the options.

A recurring error, an integration that needs attention or an application without an owner. Tell us what is happening and what needs to work next.

We confirm delivery fit and responsibilities for your version, module and environment before proposing work. Ongoing care specifies covered systems, working hours, response targets and escalation.

Independent engineering does not extend manufacturer support or replace vendor licensing. Please do not include credentials or customer records.

info@aiondata.io

Discuss IBM i / AS/400

You do not need all the technical details to start.

Just your name and email to get started. Your details are handled under our Privacy Policy.

Prefer email? info@aiondata.io

Before we begin

IBM i / AS/400 questions.

What does the end of standard support for IBM i 7.4 mean?

Since 30 September 2026, defect support for 7.4 is available only through IBM’s paid Service Extension, which runs until 30 September 2029. Plan the move to 7.5 or 7.6 while that cover is in place.

Is AS/400 the same as IBM i?

AS/400 is the platform’s original name. Today the operating system is IBM i on IBM Power servers, and RPG programs written for the AS/400 often still run on it.

Can you maintain our RPG and CL programs?

Yes. We start by locating the source for the programs that matter, the libraries they use and the jobs that run them, then agree what can be maintained before ongoing support begins.

Can we keep the core application?

Often the first scope is an interface, inquiry or operating improvement around it. The decision depends on the actual programs and supported environment.

Is this hardware maintenance?

This page concerns application and integration engineering. Hardware, operating-system support and vendor entitlements need separately identified owners.

AIONDATA provides independent engineering services. Product names identify the systems discussed and do not imply vendor endorsement.